Mark what goes.
Separate removal areas from retained construction. Include drawings, photographs and any project-specific support or coordination requirements.
DEFINE THE WORK
What comes down is only part of the question. The surrounding structure, the access and the route out all belong in the plan.

A PRACTICAL STARTING POINT
A perimeter drawing does not always show every cut needed. A large concrete section may need further segmentation where equipment cannot reach it, or where floors, glazing and occupied areas limit handling.
That is why we ask for photographs of both the material and its surroundings, as well as dimensions, thickness, access and the intended disposal arrangement.
Send your project information ↗Separate removal areas from retained construction. Include drawings, photographs and any project-specific support or coordination requirements.
Doors, stairs, elevators, loading points and equipment clearance determine how material can be handled.
Cutting, breaking, loading, disposal, excavation and reinstatement should each have a clear place in the scope.
THE NEXT STEP
Send the scope. Show us the site.
Let’s define the work.
PHOTOS · DRAWINGS · DIMENSIONS · SITE ACCESS